close

Installing the PDQ Ambi Bolt Release: A Comprehensive Guide

Embracing Safety: A Foundation of Responsibility

Unload and Verify

The very first, unwavering rule: always ensure your firearm is completely unloaded. Visually and physically inspect the chamber to confirm there are no rounds present. Remove the magazine. Repeatedly operate the charging handle to eject any remaining cartridge.

Safe Direction

Always point the muzzle of your firearm in a safe direction, away from people and any areas where accidental discharge could cause harm. The safest direction is often towards a secure, controlled range or an area where a negligent discharge would cause minimal risk.

Eye Protection

During the PDQ Ambi Bolt Release Install and any gunsmithing activity, wear appropriate eye protection. This protects your eyes from debris that might be ejected during the process, such as small springs or pieces of metal.

Workspace Considerations

Set up a well-lit and organized workspace. Good lighting helps you see the small parts and delicate mechanisms involved. A clear, uncluttered space minimizes the risk of losing parts or accidentally damaging components.

Familiarity Matters

Before you begin the PDQ Ambi Bolt Release Install, familiarize yourself with the AR-15’s lower receiver, bolt catch, and associated components. Understanding the anatomy of your firearm will make the process smoother and safer. Study diagrams, watch videos, and ensure you comprehend how each part functions.

Assembling the Necessary Tools and Materials

A successful PDQ Ambi Bolt Release Install hinges on having the right tools and materials readily available. Preparing ahead will save time and frustration.

The PDQ Ambi Bolt Release

Obviously, you’ll need the PDQ Ambi Bolt Release itself. Ensure you have the correct version for your AR-15 lower receiver. Different manufacturers and models may have slight variations.

The AR-15 Lower Receiver and Upper Receiver

Have both the lower and upper receivers on hand. These are the core components you’ll be working with.

Armorer’s Wrench or Appropriate Tools

You may not need this for the bolt catch itself, but you might need it for disassembling the lower receiver. If you’re making other modifications, an armorer’s wrench facilitates the removal and installation of the buffer tube, castle nut, and other components of the lower receiver.

Punching Perfection

A set of punches is crucial. You will need a roll pin punch for removing the existing bolt catch pin and inserting the new one. Various sizes may be necessary, so a comprehensive punch set is advantageous.

The Hammer

Use a hammer to tap the punches, gently persuading the pins to move. Avoid excessive force, which could damage the receiver or parts. A rubber mallet or a hammer with a soft face is often preferred.

The Vise’s Embrace

A bench vise is highly recommended. It provides a stable platform to secure the lower receiver, allowing you to work with both hands and preventing the receiver from moving during critical steps.

Stable Support

A gunsmithing vise block designed specifically for AR-15 lower receivers can provide additional support and stability. It fits into the magazine well, securely holding the lower receiver without causing damage.

Small Part Sanctuary

Have a small parts tray or containers ready. These will help you keep track of the existing components, such as the bolt catch spring and plunger, preventing them from getting lost.

Cleaning Solutions and Cloth

(Optional) Some owners prefer to clean and degrease parts before installation. Cleaning solvent and a lint-free cloth can be helpful in this process.

Lubricant Application

(Optional) A high-quality gun lubricant can help ensure the smooth operation of the bolt release. Apply a small amount to moving parts after installation.

Extracting the Existing Bolt Catch’s Components

Before you begin the PDQ Ambi Bolt Release Install, you must remove the existing bolt catch and its associated components. This process is usually straightforward but requires precision and care.

Pin Removal Protocol

Locate the bolt catch pin, which secures the original bolt catch. Using a roll pin punch of the appropriate size, carefully tap the pin out of the lower receiver. It may require a few gentle taps, but avoid excessive force. Support the lower receiver to prevent damage.

Catching the Bolt Catch

Once the pin is removed, the original bolt catch should be free. Gently remove it from the lower receiver. Observe how it fits and interacts with the other components.

Springing into Action

Next, remove the bolt catch spring. It’s a small, coiled spring that provides tension to the bolt catch.

Plunger Extraction

The final component to remove is the bolt catch plunger. This small, cylindrical part sits within the lower receiver and helps guide the bolt catch.

Integrating the New Ambi Bolt Release: The Transformation

Now that the original components have been removed, it’s time for the PDQ Ambi Bolt Release Install. This is where the ambidextrous functionality comes to life.

Introducing the New Catch

Insert the new bolt catch into the lower receiver, noting its configuration. Ensure it aligns with the spring and plunger housing. The PDQ design will differ slightly in how the ambidextrous paddles connect.

Spring and Plunger Reintegration

Place the new bolt catch spring into the corresponding hole. Carefully insert the bolt catch plunger into the same hole. Ensure the spring and plunger are correctly positioned before continuing.

Precise Alignment

Align the PDQ Ambi Bolt Release assembly with the bolt catch. The ambidextrous paddles should be positioned correctly for manipulation from both sides of the rifle. Pay close attention to the orientation of the paddles.

Pin Insertion Ceremony

This is arguably the most critical step of the PDQ Ambi Bolt Release Install. Insert the new pin through the lower receiver to secure the bolt catch and the ambidextrous paddles. Align the pin with the holes and gently tap it into place using the roll pin punch and hammer. Use a roll pin punch slightly smaller than the diameter of the roll pin itself to avoid damaging the surrounding receiver.

The Perfect Fit

As you tap the pin, monitor the fit carefully. Ensure that the pin is flush with the surface of the receiver and that the bolt catch can move freely.

Verifying Performance: The Moment of Truth

Once you’ve completed the PDQ Ambi Bolt Release Install, it’s time to test its functionality and confirm the upgrade was successful.

Ambidextrous Operation Test

Manipulate the bolt release lever on both the left and right sides of the lower receiver. The bolt catch should release the bolt smoothly and efficiently from both sides. This is the primary function of the PDQ Ambi Bolt Release.

Bolt Cycling Evaluation

Manually cycle the bolt, ensuring it locks back on an empty magazine and releases smoothly when the bolt catch is activated. Repeat this several times to verify proper operation.

The Empty Magazine Inspection

Insert an empty magazine and manually cycle the charging handle. The bolt should lock to the rear on the follower. Ensure the bolt catch engages correctly.

Observing Alignment

Visually inspect the bolt catch, the bolt, and the bolt carrier group for proper alignment. Ensure there are no signs of binding or interference. Check the paddles of the PDQ Ambi Bolt Release to ensure they function properly.

Finalizing the Build: Beyond the Install

Once you have confirmed that the PDQ Ambi Bolt Release Install is complete and the function test is successful, you can perform some final steps.

Optional Cleansing

Cleaning the new bolt catch and related parts will remove any residue. Use a suitable gun cleaning solvent and a soft cloth.

Lubrication Application

Apply a small amount of high-quality gun lubricant to the moving parts of the bolt catch. This will help ensure smooth operation and extend the life of the components.

Routine Maintenance Review

Discuss the importance of periodically inspecting the bolt catch for wear and tear. Clean and lubricate as needed. Keep your AR-15 in top operating condition by routinely cleaning and lubricating all of its components.

Always Verify

Prior to firing your firearm, conduct a thorough safety check to ensure that all components are functioning correctly.

Concluding Thoughts

The PDQ Ambi Bolt Release Install is a worthwhile upgrade that greatly enhances the ergonomics and user experience of your AR-15. The ambidextrous nature provides a significant advantage, particularly for left-handed shooters or those who prefer to operate their rifles from either side. By following this comprehensive guide, you can successfully complete the PDQ Ambi Bolt Release Install, improving your rifle’s functionality.

The PDQ Ambi Bolt Release is more than just a part; it’s an investment in your shooting experience. Embrace the benefits of a fully functional ambidextrous bolt release and enjoy the added control and efficiency it brings.

Disclaimer

This article is intended for informational purposes only and does not constitute professional gunsmithing advice. While we have taken steps to provide accurate and detailed instructions, we are not responsible for any damage to your firearm or any injury resulting from attempting this procedure. If you are unsure or uncomfortable with any step of the process, consult a qualified gunsmith. Firearm modifications can affect safety and reliability; always test the firearm in a safe environment after making any changes.

Leave a Comment

close